Emergency 60kVA UPS Hire for Energy Plant in Cheshire

Project Overview

YorPower was contacted to provide an emergency temporary UPS rental and hire solution for an energy plant in Cheshire. The customer required a reliable backup power system at short notice to support site operations, with the hire period starting as soon as possible.

To meet the requirement, YorPower supplied a temporary 60kVA Riello UPS system, on an initial two-month hire period, with the option to continue on a month-by-month basis thereafter.

The Requirement

The customer needed an emergency UPS solution that could be delivered, installed and commissioned quickly, ensuring critical equipment at the energy plant had dependable backup power in place.

The scope of supply included:

  • Temporary 60kVA Riello UPS system
  • Battery cabinet housing 40 x 12V 90Ah batteries
  • DC battery build
  • Full installation and commissioning
  • Initial two-month rental period, with month-by-month continuation available

YorPower UPS Solution

Once the enquiry converted, YorPower followed its standard pre-installation process to ensure the project was delivered safely and professionally.

Ahead of the site visit, our team provided the customer with a full method statement and risk assessment. We also communicated all pre-delivery and post-delivery arrangements clearly, helping to ensure the hire process was straightforward from the outset.

On arrival, YorPower UPS Engineer Jack reported to the site manager to confirm the works being carried out that day and to ensure all site procedures were followed.

Installation and Commissioning

Jack carried out the installation and commissioning of the temporary 60kVA Riello UPS system, complete with a battery cabinet housing 40 x 12V 90Ah batteries.

The UPS and battery system were fully installed, tested and commissioned on the day. Following completion, the unit was left running online and in normal operation.

Following the works, YorPower provided an Installation and Commissioning Certificate, which was signed by the customer.

The Outcome

YorPower delivered a fast, professional and reliable emergency UPS hire solution for the customer’s energy plant in Cheshire. The temporary 60kVA system was installed and commissioned successfully within the day, providing the customer with the backup power protection they required.

The project demonstrated YorPower’s ability to respond quickly to urgent hire requirements while maintaining high standards of communication, safety documentation, installation quality and customer service.

Customer Testimonial

“Just a follow up to the delivery of the temporary and installation by Jack, I just wanted to let you know how pleased I was with the whole process. From first contact with Danielle, to the subsequent delivery and installation it has been professional and simple process.

I would like to thank you for you and your teams’ efforts in this matter as it has been exceptional. If you could pass on my thanks to Jack who put the effort to ensure the system was up and running within the day and was friendly and helpful throughout.”

Conclusion

This emergency UPS hire project highlights YorPower’s experience in providing temporary backup power solutions for critical applications. From the first enquiry through to delivery, installation, commissioning and certification, the team ensured the customer received a professional, efficient and fully operational UPS hire solution at short notice.