Reliable Power for 24/7 Breakdown Recovery Operations

Client: A 24/7 Breakdown Recovery Operator
Location: North East, UK
Generator Supplied: YorPower 28kVA Generator (Model YWP28RS)
Extras Included: Automatic Transfer Switch (ATS) and socket installation

 

Background

This client, a long-established 24/7 vehicle recovery operator, required a dependable backup power solution to ensure their operations remained uninterrupted at all times — even during mains power failures. YorPower had previously supplied equipment to the business several years ago, and their return to us reflected their confidence in our reliable products and responsive service.

The Requirement

Operating around the clock, the client needed a generator capable of providing consistent and immediate backup power. Reliability, ease of operation, and automatic switching between mains and generator power were key considerations for their emergency response facility.

The Solution

After reviewing their requirements, YorPower supplied a 28kVA YWP generator, complete with a fully integrated Automatic Transfer Switch (ATS) and custom socket installation. This configuration ensured seamless transition to generator power during outages, keeping vital communications and recovery equipment operational without delay.

Project Delivery

YorPower managed the supply from enquiry through to delivery, ensuring a smooth and efficient process. The generator was delivered promptly and prepared for commissioning, which will be completed by the client’s onsite team or a YorPower engineer at a later date.

Outcome

The client now benefits from a robust, high-performance power backup system designed to support their 24/7 operations with minimal downtime. The inclusion of the ATS and sockets provided a complete, ready-to-connect solution tailored to their operational needs.

Key Highlights

  • Repeat customer: Returned to YorPower after previous successful orders
  • Model supplied: 28kVA YWP generator
  • Extras: ATS and socket installation
  • Commissioning: To be completed on-site
  • Purpose: Backup for 24/7 breakdown recovery operations